Skip to main content

    Time Remaining Estimate

    Read render progress, the time remaining, elapsed time and the frame timers on each job card while a render runs.

    Last updated By the RenderGod Team

    Rendering job card reading Rendering 47%, Frame 118/250, ETA 15m 30s, Elapsed 13m 58s, with a progress bar, a live frame timer and the previous frame time

    While a job renders, its card shows how far it has come and how long it has left. Use it to decide whether a render will finish before you leave, or to plan the next job. The Render Remaining Time Estimate is included in FREE and PRO, and always on.

    The status line

    The amber status line is made of parts separated by dots.

    PartExampleMeaning
    PercentageRendering 49%How much of the frame range is done.
    FrameFrame 123/250The frame being rendered and the total.
    ETAETA 15m 4sThe estimated time until the job finishes. Hover it to see its full name.
    ElapsedElapsed 14m 27sTime spent rendering this job so far, not counting pauses.
    Blender statusPath Tracing Sample 12/128What Blender says it is doing right now.

    Times show as seconds, minutes and seconds, or hours, minutes and seconds.

    When the ETA appears

    The ETA appears once two frames have finished, so from the third frame on.

    A + after the time, as in ETA 12m 30s+, means the current frame is taking longer than the frames before it. The job may finish later than shown.

    The frame timer

    Under the status line, next to the progress bar:

    • The blue chip: counts up the time of the frame being rendered, as minutes, seconds and hundredths.
    • prev:: how long the previous frame took. It is hidden on the first frame.

    Compare the two to spot a frame that is slower than usual.

    The progress bar

    The bar moves smoothly within each frame, so it does not jump only when a frame finishes. Its color tells you the kind of job.

    ColorJob
    YellowBlender render
    PurplePhysics baking
    OrangePaused job, frozen at the paused point
    GreenImage sequence to video
    BlueVideo to image sequence

    Several frame ranges

    With Multi Frame Ranges, progress and time remaining count only the frames you asked for. Gaps between ranges are not counted.

    Job card with two frame ranges, 1-48 done and 120-160 rendering, and an overall progress of 70 percent

    For example, ranges 1-2 and 10-11 make four frames. When frame 10 starts, two of the four are done, so the job reads 50%.

    After the job finishes

    The status changes to Done, with the total render time beside it, such as in 50s. The total adds up every session of the job and leaves out pauses.

    Conversion jobs show a percentage and a frame count, such as Creating video... 40%, but no ETA.

    Progress outside the window

    • The RenderGod taskbar button (Windows) or Dock icon (macOS) shows the progress of the current job.
    • The Telegram bot reports it with /status and, if you turn it on, in hourly updates. See Telegram Bot.
    • Remote Control and RenderGod for iPhone show progress and time remaining too. See Remote Control.

    Next steps

    On this page