Skip to main content

    Render Schedule

    Start the queue at a set time, stop rendering at another, and repeat on the weekdays you choose.

    Last updated By the RenderGod Team

    Render Schedule panel with Start queue and Stop Rendering cards, Repeat weekly and the weekday buttons

    Render Schedule starts the queue for you at a time you choose, and can stop it again later. Use it to render overnight, or only during hours when the computer is free.

    PROIncluded in PRO and in the 7-day free trial. Compare plans

    Open Render Schedule

    Use any of these:

    • Click Schedule in the queue toolbar.
    • In a narrow window or on a touch screen, open More queue actions and choose Render Schedule.
    • Open Settings, then Render Schedule under Queue.

    You need to be signed in to switch a part of the schedule on. You can switch a part off without signing in.

    Set up a schedule

    Everything saves as soon as you change it, and times are in your computer's local time.

    1. Turn on Start queue and set the time with the hour, minute and AM, PM or 24h dropdowns.
    2. To stop at a set time too, turn on Stop Rendering and set its time.
    3. To repeat, turn on Repeat weekly and click the weekdays, Mon to Sun. Select all picks every day. At least one day stays selected.

    The two parts are independent. You can schedule only a start, or only a stop for a queue you start by hand. Repeat weekly can be switched on once Start queue or Stop Rendering is on.

    When both parts are on, the panel shows the length of the render window, such as 8h 00m. If the stop time is at or before the start time, it adds "Stop is next day", so a schedule from 10:00 PM to 6:00 AM runs overnight.

    Without Repeat weekly, each part runs once and then turns itself off.

    Activate and stop the schedule

    A schedule is active as soon as Start queue or Stop Rendering is on. A Render Schedule Active card then appears in the queue, reading "Next start", "Next pause" and either the repeat days or "Runs once".

    • Click on the card to open the schedule settings.
    • Click Cancel Schedule to turn off both parts. Your times and days are kept for next time.

    You can also switch each part off in the settings. Starting or stopping the queue by hand does not cancel the schedule.

    What happens at the scheduled time

    TimeQueue stateResult
    StartNot running, with queued jobsThe queue starts.
    StartNot running, no queued jobsNothing starts. The settings show "Last scheduled start: No queued jobs to process".
    StartAlready runningNothing changes.
    StopRunningRendering stops. The frame in progress is lost and the job shows Paused at frame N.
    StopNot runningNothing happens.

    After a stop, click Start or wait for the next scheduled start. The job continues from the frame it stopped on. See Render Queue.

    RenderGod must be running

    The schedule only runs while RenderGod is open and the computer is awake. If RenderGod is closed, or the computer is asleep or off at the scheduled minute, that start or stop is skipped. A weekly schedule moves on to its next day.

    Saved but not active

    If your plan no longer includes Render Schedule, the settings read "Saved, but not active right now: nothing starts or stops by itself." You can still switch it off.

    Next steps

    On this page